Case Study

Barton Dock Road in Manchester

Avanti commissioned to remove bonded asbestos from grounds of new McDonald’s branch

Design of onsite remediation methods to remediate the asbestos down to a safe level and allow the land to be taken back into use.

The asbestos was a mixture of bonded and fibrous asbestos across the site with some hotspots of asbestos which required 14 days notification to HSE.

The quantity of waste taken off site was minimised

Hot spot areas were targeted to reduce quantities of hazardous waste to as low a volume as possible.

Where possible, the hazardous waste threshold of any waste was lowered down to a classification of non-hazardous waste