Land remediation works to brownfield site to facilitate £45m development 

Design of onsite remediation methods to remediate the asbestos down to a safe level and allow the land to be taken back into use.

The asbestos was a mixture of bonded and fibrous asbestos across the site with some hotspots of asbestos which required 14 days notification to HSE.

Avanti was able to reduce the landfill tax and associated costs of the traditional ‘dig and dump’ method by implementing an ‘in situ’ remediation strategy:

The quantity of waste taken off site was minimised

Hot spot areas were targeted to reduce quantities of hazardous waste to as low a volume as possible.

Where possible, the hazardous waste threshold of any waste was lowered down to a classification of non-hazardous waste